Critical & Required Repairs
Critical & Required Repairs
Why They're Needed
More than half of our schools are 30 years old or older. Most major school roofing, heating, electrical and other systems are designed to last about 20 to 30 years.
By repairing or replacing major systems, we reduce long-term maintenance costs. These projects keep our classroom and other learning environments safe and healthy. Then, students can focus on learning, not on whether their classroom is too hot or too cold.
Repairs by School
See the critical and required repairs needed at each school by clicking on each school name below. Projects with a ✔ are complete.
-
- Repair exterior siding
- Repair exterior windows
-
- Replace operable wall in gymnasium
- Update playground equipment
-
- Heating and ventilation system – repair/replace
- Improve vehicular access
- Install additional parking
- Update playground equipment
-
- Replace roof on portable classroom
- Repair exterior walls (west side of gymnasium)
- Update playground equipment
-
- New operable walls in multi-purpose room
- Update playground equipment
-
- Repair/replace heating and ventilation system
- Replace roof
- Update playground equipment
-
- Install classroom doors
- Replace heating and air conditioning system
- Update playground equipment
-
Update playground equipment
-
- Heating and ventilation system – repair/replace
- Update playground equipment
- New gymnasium/music room partitions
- Replace tile floor in gymnasium
- Replace roof on portable classroom
-
- Update playground equipment
- Improve drainage for the playfield
-
Re-surface and re-stripe track
-
- Heating and ventilation distribution systems – replace classroom air handling units
- Electrical distribution repairs
- Repair divider curtain – auxiliary gymnasium
- Tile flooring repairs
-
In addition to the repairs below, major construction was also completed at Klahowya. Work included an addition for more classrooms, an auxiliary gymnasium, and a middle school band room. Visit the Klahowya project page for more details.
- Update Entrance Cover
- Roof Repairs and Painting
- All – Weather Athletic Field
-
In addition to the repairs below, major construction was also completed at Olympic. Work included replacing portables with permanent classrooms, modernizing career and technical education classrooms and updating the commons. Visit the Olympic project page for more details.
- All-weather athletic field
- Improve access for those with disabilities
- Improve pedestrian access – multiple areas
- Install all-weather practice field
- Upgrade Silverdale Stadium – changing rooms, restrooms